|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
![]() |
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
ABSORBING
CLAMPS FOR EMI TESTING The absorbing clamp consists of a calibrated ferrite current transformer operating in the frequency range of 30-1000 MHz and two groups of ferrite rings. The ferrite rings acts as an absorbers of energy and stabilizes impedance. One set of ferrite rings surrounds the lead from the transformer to the EMI meter to minimize standing waves. The second group of ferrite rings surround supply cable from the equipment under test. These rings act as an absorber of energy and an impedance stabilizer to isolate the equipment under test (EUT) from the external power source. These rings are made up of two halves. Therefore, the power cable from the EUT can be placed inside the aperture of the rings. CALIBRATION All Com-Power absorbing clamps are individually calibrated before shipment with equipment traceable to National Institute of Standards and Technology (NIST). The data and the certificate of calibration are shipped with each unit.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Last Updated: 12/12/2007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Copyright
Com-Power Corporation 2004 The information presented on this web site is intended to be accurate and authoritative information on the subject matter covered. It is distributed with the understanding Com-Power assumes no liability whatsoever in connection with its use. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
![]() |